WA NEWSPAPER HOUSE REDEVELOPMENT NEW LIFT SHAFT & STAIRWELL

In 2010 the old WA Newspaper House on St. Georges Tce. Perth City underwent major redevelopment.  A new external lift and stair well needed to be constructed at the end of adjoining laneway.  Compression and tension piling needed to be designed to support loads up to 900kN for the new structure. Difficult ground conditions of perched watertables over variable clays and sands required deep piles.

Limited site access via a laneway, a complex array of above and below ground services and a restricted work platform meant conventional piling would be difficult if not impossible.  We were asked to come up with a cost and time effective workable solution that did not impede other surrounding construction works.

EXISTING PLASTICS MANUFACTURING PLANT FOUNDATION UPGRADES

An existing factory operating 24hrs 7 days per week required foundation upgrades.  Certain design & works criteria included limited headroom, surrounding infrastructure, non obstructive works, dust control and the need for a speedy solution all meant that screwpiles were the best solution.

A total of 38 x 150kN x 25m deep screwpiles were successfully installed non stop over a 96hr period without plastic molding production disruption.

MINING CAMPS - CYCLONIC TIE DOWN GROUND ANCHOR FOUNDATIONS

There are dozens of mining camps successfully tied down to the ground in cyclonic regions using our patented screwpile building interface systems.  We claim our systems are the fastest and most cost effective ground anchoring system in the world today.  A system that provides significant cost advantages not only in building commissioning but also decommissioning along with the added benefit of being totally reusable on other projects after decommissioning.

With the ability to install the foundations and secure a transportable building to the ground in under 1 hour our QWIK-Connect and Wellard Hammer-Loc building interface connection methods provide unparalleled design and installation advantages.

Our minesite ready experienced crews ensure deadlines are met all within our quality assurance systems.  View our video simulations in our system here.